RDV Systems - I-84 Hartford W2

I-84 – Corridor – Hartford, CT

CLIENTS: TranSystems Corp.; Connecticut DOT The I-84 Hartford corridor replacement study (www.i84hartford.com) has been described by ENR as the highest dollar value project currently in planning and design in the USA.  RDV was initially engaged to provide a model of the 3 mile corridor showing existing conditions only, with VISSIM traffic simulation superimposed on the 3D model.  This model was …