RDV Systems - I-84 Hartford W2

I-84 – Corridor – Hartford, CT

CLIENTS: TranSystems Corp.; Connecticut DOT The I-84 Hartford corridor replacement study (www.i84hartford.com) has been described by ENR as the highest dollar value project currently in planning and design in the USA.  RDV was initially engaged to provide a model of the 3 mile corridor showing existing conditions only, with VISSIM traffic simulation superimposed on the 3D model.  This model was …

RDV Systems - Derby Main Street 2

Main Street Improvements – Derby, CT

CLIENTS: Luchs Consulting Engineers; Town of Derby, CT This model shows the proposed improvements and streetscaping for SR-115, which is also Main Street in the Town of Derby, CT.  The model is being used for coordination between town officials and Connecticut DOT, and for outreach to the public and business owners. Back to Case Studies