T-Minus 14 Days And Counting Gallery T-Minus 14 Days And Counting 123BIM, 3D Model Instant Rendering, 3D Visualization, BIM for Infrastructure, Case Studies, MASS DOT, Rapid Design Visualization T-Minus 14 Days And Counting
A Contractor’s Race Against The Clock Gallery A Contractor’s Race Against The Clock 123BIM, 3D Visualization, Case Studies, MASS DOT, Rapid Design Visualization, Road Widening Projects A Contractor’s Race Against The Clock
“We Had No Idea” Gallery “We Had No Idea” 123BIM, Case Studies, Road Safety, Utah DOT “We Had No Idea”
One Interchange – Three Design Firms – Seven Alternatives Gallery One Interchange – Three Design Firms – Seven Alternatives 123BIM, 3D Visualization, BIM Software, Case Studies, North Carolina DOT One Interchange – Three Design Firms – Seven Alternatives
I-26 / SC-27 Interchange Reconfiguration Gallery I-26 / SC-27 Interchange Reconfiguration 123BIM, 3D Visualization, Case Studies, Road Widening Projects, South Carolina DOT I-26 / SC-27 Interchange Reconfiguration