When Being Ahead of The Curve Is AMatter of Life and Death Helping Engineers Design Safer Roads, Save Millions, and Save Lives Download PDF Introduction Texas DOT, …
T-Minus 14 Days And Counting – A 4D Approach to Construction Staging
T-Minus 14 Days And Counting A 4D Approach to Construction Staging Download PDF Introduction The North Washington Street Bridge on Route 99 is an important …
JF White Case Study – A Contractor’s Race Against The Clock
A Contractor’s Race Against The Clock A Winning Approach to Project Pursuits Download PDF Introduction In April of 2020, JF White Contracting Company, a subsidiary …
Utah RSA Case Study – UDOT at the Cutting Edge of Road Safety
“We Had No Idea” UDOT at the Cutting Edge of Road Safety Download PDF Introduction Utah’s Department of Transportation is motivated by three strategic goals, …
NCDOT’s Solution for a Successful Public Meeting | I-440 Glenwood Ave.
One Interchange. Three Design Firms. Seven Alternatives. NCDOT’s Solution for a Successful Public Meeting Download PDF Introduction Making improvements to improve safety and ease congestion …
Pevida Highway Designers Use 123BIM For S.R. 40 Access Management Public Meeting
Ocala, FL (FDOT’s District 5) | SR-40 From SW 27th Avenue to MLK Jr. Avenue Project Owner: Florida Department of Transportation Project Designer: Pevida Highway …
SCDOT Uses RDV to Present Interchange Design Alternatives
I-26 / SC-27 Interchange Reconfiguration SCDOT’s First Public Meeting Using 123BIM Download PDF Introduction The South Carolina Department of Transportation is conducting an environmental assessment …
123BIM Delivers On Short Notice
Project Owner: Nevada Department of Transportation Location: I-515/I-215 Interchange, Henderson, NV. Objective: Public Involvement / Open House to solicit feedback and educate the public about changing traffic …
UDOT Uses RDV’s Interactive 3-D Platform to Gain Public Support
Project Owner: Utah Department of Transportation Project Designers: Kimley Horn & Associates, Michael Baker International and H.W. Lochner. The three mile stretch of highway 5600 …
How Oregon DOT Utilizes Augmented Reality to Win Public Support
This is a great use case of visualization and Augmented Reality by Oregon DOT. Project Owner: Oregon DOT Location: US 97: S. Century Drive to …
How to Visualize Quickly and Effectively.
How Florida DOT was able to visualize a complex new intersection design quickly, effectively and at very low budget. Project Owner: Florida DOT Consultant: Dewberry …
Derby, CT – Main Street
The City of Derby is the smallest city in the state of Connecticut, covering 5.3 sq. Miles with 12,080 residents. Route 34 is a primary …